The Challenges of EV Charging Infrastructure and the British Planning System

As the UK accelerates its transition to electric vehicles (EVs), the demand for charging infrastructure has never been higher. With the government’s goal to phase out new petrol and diesel car sales by 2035, EV adoption is growing rapidly. However, the rollout of charging stations is struggling to keep pace. The obstacles lie not only in infrastructure costs and grid capacity but also in the complexities of the British planning system, which often slows down deployment at both local and national levels.

​

This insight piece explores the challenges of EV charging infrastructure development in the UK, from planning permissions to grid limitations, and highlights the key barriers that must be overcome to ensure a smooth transition to a fully electrified transport system.

​

The EV Charging Demand-Supply Gap

​

The UK currently has around 53,000 public EV charging points, but estimates suggest that to support mass adoption, this number must reach 300,000 to 500,000 by 2035. While progress is being made, the reality is that charging infrastructure remains highly uneven. Many rural and suburban areas have limited access, and even in urban centres, the availability of rapid chargers is inconsistent.

​

The primary challenges stem from two major bottlenecks:

  1. The Planning System – Delays in approvals and inconsistencies between local authorities slow down charging infrastructure development.

  2. National Grid Constraints – The need to transfer electricity from generation sites to where demand is highest presents a significant logistical and financial challenge.

 

1. The Planning System: A Slow and Complex Process

 

EV infrastructure projects face the same planning hurdles as any major infrastructure development in the UK. While local authorities are encouraged to support EV rollout, the planning process is lengthy, fragmented, and inconsistent across regions.

 

Key planning challenges include:

  • Bureaucratic Delays: Applying for planning permission for a new charging station can take months, if not years, due to administrative backlogs. Even minor installations, such as on-street chargers, often require multiple approvals from different government agencies.

  • Local Authority Variability: Each council has different policies regarding EV infrastructure, meaning that while some areas streamline approvals, others impose significant restrictions, creating a postcode lottery for EV charging accessibility.

  • Heritage and Land Use Constraints: Many UK towns and cities have strict conservation rules that make installing new infrastructure difficult. In historic city centres, public chargers must adhere to aesthetic regulations, further slowing down implementation.

  • Public Consultation and Opposition: While the majority support EV infrastructure in principle, local resistance can delay projects. Concerns about street clutter, parking space reallocation, and visual impact can lead to objections and lengthy appeals.

 

2. National Grid Constraints: A Power Distribution Challenge

 

Beyond the planning system, another major bottleneck is the UK’s electricity grid capacity and distribution. The National Grid faces significant challenges in ensuring that electricity generated at power stations, offshore wind farms, and solar farms reaches the urban locations where EV charging demand is highest.

 

The Grid’s Biggest Challenges

  • Aging Infrastructure: The UK’s electricity grid was designed for a centralised power model, where large power stations distribute energy to homes and businesses. However, EVs introduce a new and highly unpredictable demand load, requiring substantial upgrades.

  • Connection Costs and Delays: Installing rapid chargers (50kW-350kW) requires significant grid upgrades. In many cases, businesses and local councils face multi-million-pound costs just to connect new chargers to the grid. In some areas, waiting times for a grid connection exceed two years due to capacity constraints.

  • Uneven Power Distribution: Electricity generation in the UK is heavily concentrated in offshore wind farms (Scotland and the North Sea) and nuclear plants (Hinkley Point, Sizewell). However, major demand is in cities like London, Manchester, and Birmingham. The National Grid must invest billions in upgrading transmission lines to move electricity from source to demand centres efficiently.

 

Case Study: London vs. Rural Areas

London has some of the most extensive EV charging infrastructure in the country, with thousands of on-street chargers and rapid charging hubs. However, even in the capital, challenges persist. Grid capacity constraints in central London mean that installing high-power chargers often requires expensive substation upgrades, delaying progress.

By contrast, rural areas face an entirely different challenge—low population density means that the commercial viability of charging networks is weak. Many operators avoid investing in sparsely populated regions, leading to an emerging urban-rural charging divide.

 

How the UK Can Overcome These Barriers

To meet national EV adoption targets, the UK must take a more strategic approach to EV charging infrastructure. This requires reforms at both the planning system and the energy distribution level.

 

1. Reforming the Planning System

  • National Standardisation: A unified, streamlined planning process across all local authorities would accelerate EV charger deployment.

  • Permitted Development Rights: Expanding permitted development rights to cover more types of EV infrastructure would remove unnecessary bureaucracy.

  • Street Charging Prioritisation: Councils must be mandated to provide on-street charging in residential areas where private driveways are unavailable.

 

2. National Grid Upgrades and Investment

  • Decentralised Energy Generation: Encouraging local renewable energy production (solar panels, battery storage) can reduce strain on the national grid.

  • Investment in Smart Grids: A smart energy grid that can balance demand dynamically will help prevent overloads and improve efficiency.

  • Fast-Track Grid Connections for Charging Operators: The National Grid must prioritise charging infrastructure projects to prevent long waiting times.

 

The Role of Micromobility in Easing the Strain

 

One emerging solution to these infrastructure challenges is micromobility. Unlike electric cars and vans, micromobility solutions—such as e-bikes, e-scooters, and cargo bikes—require significantly less energy to charge.

  • No Need for High-Powered Chargers: Most micromobility vehicles can be charged using a standard 240V 3-pin plug, removing the need for expensive charging networks.

  • Reduced Demand on the Grid: Charging an electric bike requires only a fraction of the electricity needed for an EV, making micromobility a low-impact, scalable alternative.

  • Urban Efficiency: Cargo e-bikes can replace vans for last-mile deliveries, reducing traffic congestion and the strain on urban charging networks.

 

Many businesses are now turning to micromobility solutions to bypass the challenges of EV infrastructure rollout while still achieving their sustainability goals.

 

Conclusion: The Future of EV Charging in the UK

 

The UK’s EV transition is inevitable but fraught with challenges. The existing planning system and grid limitations threaten to slow down progress, leaving gaps in the infrastructure needed to support widespread EV adoption.

 

To overcome these hurdles, the UK needs policy reforms, grid investment, and alternative solutions like micromobility to create a truly sustainable urban transport ecosystem. Without these changes, the risk remains that EV demand will outstrip infrastructure supply—ultimately delaying the country’s path to net-zero transportation.

 

By taking a proactive, multi-faceted approach, the UK can ensure that charging infrastructure keeps pace with EV adoption, supporting both businesses and individuals in the green mobility revolution.

RELM Logistics

3 Roslin Road

London

W3 8DH

United Kingdom

​

+44(0)20 4572 3007

​​

​Enquiries@RELMLogistics.com

  • LinkedIn
  • LinkedIn

RELM Logistics is owned and operated by Clean Air Miles Ltd.

​

​Company Number 11259636
VAT Number 479392534

D-U-N-S® Number: 223760184

bottom of page